Project Overview
The Brief: Client wanted to test a new type of OLE (Overhead Electric Line) in a tunnel at St Pancras Station in London. The Test section was 30 meters long and we developed, built a system that controlled 6 cameras and 6 lights to turn on/off every a train passed 24hrs a day.
Algorithms were constructed to record all train movements, as well as turning on/off 6 cameras a long with lights. All train footage was stored locally and retrieved every months for review. This trial lasted 6 months.
- Software/Hardware Development
- Automatic storage of all footage locally
- Custom camera algorithms and functions were developed